Swimming pool Rovinj

Investor: City of Rovinj, from 2020-2022.

Design and supervision of a rehabilitation center with an indoor swimming pool of 50 m. The specificity of the construction is a steel lattice structure with a span of 36 m, on which there is a green roof. Underneath is a pool designed as an Inox shell. The rest of the building is mostly AB with another smaller pool.