Podgora, 2016-2018.
The project is divided into two separate phases, the reconstruction of the Agava, Oliva, Mimoza and Caluna outbuildings in the first phase, and the reconstruction of the Minerva Hotel and the removal of the Mediteran Hotel in the second phase. The gross floor area of the first phase is about 6,000 m2, while the reconstruction area of the second phase is about 20,000 m2. The floor plan of the Minerva hotel extends through 15 floors, which are partially buried in the ground up to the ground floor. The building was reconstructed in accordance with architectural requirements, with partially existing documentation in the zone of high seismicity.